The Walls Are Closing In
We are very close to drywall now. On Friday the subs came in and put insulation into all of the applicable walls so it gave us a better feel of how big the rooms are going to be and how the light is going to work out. The first picture below are the joists for the flooring that will go into the storage room behind the master bathroom. Access to it will be from a hallway off the main hallway. There will be one step up into the storage area because excavating that area turned out to be against code.

This is a shot from the end of the hallway looking back towards the stairs that go up to the main level of the house. Next to the stairs will be the hallway closet for linens, etc.

This is the part of the office where Bob's desk will go.

This is the part of the office where Emily's desk will go.

This is a shot from the deck looking through the doorway that goes into the office. The door that is on there right now is only temporary. The real door has a full pane of glass in it for additional natural light.

This is a shot looking down the stairs towards the end of the hall.

This is a picture of the large closet in the guest bedroom. There seems to be a dog problem down here so we'll look into having someone out for that.

This is the fiber fab insert for our shower. It is a neo-angle corner shower. The doors are on their way and the faucet and shower head are waiting to be installed.

This is a picture of our basic soaking tub in the guest bathroom. There is a half-wall you can see at the end of it that has been framed.

This is a shot from the bathroom looking in to where the toilet will be located. There will be a door installed here going into that area.

This is a shot of the guest bedroom and it's two wings. The bigger section of it is where the bed will go. The smaller section (the one with one window to the right of the picture) can be for a desk or a smaller bed.

Another picture of the office. This is the door to the deck, this door is temporary and will be replaced by one that has the full pane of glass.
This is a shot from the end of the hallway looking back towards the stairs that go up to the main level of the house. Next to the stairs will be the hallway closet for linens, etc.
This is the part of the office where Bob's desk will go.
This is the part of the office where Emily's desk will go.
This is a shot from the deck looking through the doorway that goes into the office. The door that is on there right now is only temporary. The real door has a full pane of glass in it for additional natural light.
This is a shot looking down the stairs towards the end of the hall.
This is a picture of the large closet in the guest bedroom. There seems to be a dog problem down here so we'll look into having someone out for that.
This is the fiber fab insert for our shower. It is a neo-angle corner shower. The doors are on their way and the faucet and shower head are waiting to be installed.
This is a picture of our basic soaking tub in the guest bathroom. There is a half-wall you can see at the end of it that has been framed.
This is a shot from the bathroom looking in to where the toilet will be located. There will be a door installed here going into that area.
This is a shot of the guest bedroom and it's two wings. The bigger section of it is where the bed will go. The smaller section (the one with one window to the right of the picture) can be for a desk or a smaller bed.
Another picture of the office. This is the door to the deck, this door is temporary and will be replaced by one that has the full pane of glass.